YONGS LED display has the advantages of energy saving and environmental protection, and the development of LED display industry has become the main trend. Since the technology and product attributes used in the LED display are very different from those of traditional lamps, the current general safety standards for lamps are obviously not applicable.
The LED display screen is a solid-state semiconductor component, which uses current to flow forward to the coupling of the semiconductor pn junction, and then the negatively charged electrons and the positively charged holes separated in the semiconductor combine with each other, and Producing photon emission, different kinds of LEDs are capable of emitting light at wavelengths ranging from infrared to blue, and violet to ultraviolet.
The bulbs of LED display lamps are small in size, light in weight, and encapsulated with epoxy resin, can withstand high-intensity mechanical shock and vibration, are not easy to break, and have a long brightness decay cycle, so their service life can be as long as 50,000-100,000 hours. More than 1,000 hours of traditional tungsten bulbs and 10,000 hours of fluorescent tubes. Since the service life of LED lamps can reach 5 to 10 years, it can not only greatly reduce the cost of lamp replacement, but also because of the characteristics of very small current to drive light, under the same lighting effect, the power consumption is only 1/2 of the fluorescent tube, so Jinan LED display also has the advantages of power saving and energy saving.
YONGS, a professional manufacturer of LED displays, will tell you about the installation process of LED displays
1. How to install the LED display. Before the installation of the display screen, we notify the construction party to conduct a survey on the installation site. After the construction party proposes an installation plan, the construction can be carried out only after the approval of our technical director and the person in charge of the site.
2. The installation location of the LED display. The construction party should carefully measure the installation position before installation. After installation, the display screen should be symmetrical, harmonious and beautiful with the original building. If the above effect cannot be achieved after installation, it should be modified and adjusted immediately.
3. Software testing of the display. Before the control system of the display screen leaves the factory, the construction party should confirm the test content of the display screen with us.
4. During the construction process, the construction party cannot destroy the original decoration structure of the building without authorization. If the original decoration structure needs to be changed due to the restrictions of the construction site, the construction must be approved by our technical director and the person in charge of the site. To restore the original decoration results, the beauty of the original building shall not be damaged.
5. Installation of display screen accessories. The switch, leakage protector and network interface of the display screen must be complete. Before installing these auxiliary facilities, the installation location must be confirmed by the person in charge of the site before installation.